Home Auto Repair 1994-2007 Dodge Ram 2500 Front Leveling Installation Instructions

1994-2007 Dodge Ram 2500 Front Leveling Installation Instructions

125

Download 1. To begin installation, block rear wheels and apply parking brake so that the vehicle is stable and cannot roll forward or back. Lift front of the vehicle on appropriate lift points, such as the frame, and support the frame with jack stands on both passenger and driver sides. Remove front wheels. 2. Position a floor jack under the front axle and raise jack until it makes contact with the front axle. (See Figure 1) 3. On the drives side, place an index mark on the stock coil spring and another index mark directly across from the first mark on the lower coil spring perch. This will allow you to reinstall the stock coil spring in its original position. Repeat step 3 on passenger side. 4. Disconnect top nut on sway bar end links on driver and passenger side, set nut, retainer, and bushing aside. Pivot sway bar up and out of the way. (See Figure 1) 5. Disconnect nut from passenger side drag link (outer tie rod end). Hit steering knuckle with a hammer at the point where the drag link stud comes through. This will break the stud loose from the steering knuckle. Breaking the stud loose may require the use of a ball joint separator. Gently tap the stud down through the knuckle. Be careful not to harm the stud or stud threads. Moving this out of the way allows access to the passenger lower shock bolt. (See Figure 1) 6. On driver’s side, locate the top of shock absorber stud, located in the engine compartment. Remove the top nut, retainer washer, and grommet from the shock. (See Figure 2)